This project involved comprehensive mechanical and electrical infrastructure works for a mission-critical facility environment requiring high operational reliability and system efficiency. TERAS IMPIANA SDN. BHD. was responsible for supporting the installation, coordination, testing, and commissioning of integrated M&E systems to ensure smooth operational performance.
The scope included refrigerant copper piping installation, control wiring systems, drain piping works, VRV systems, CRAH units, and FWU infrastructure integration. Throughout the project execution, emphasis was placed on engineering precision, safety compliance, technical coordination, and long-term operational sustainability to support the facility’s critical infrastructure requirements.